PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Shear wall panels at Elev. 1,2,3 2nd floor Facing West (800x600).jpg Waterproofing foundation walls A-B line 4 Facing West (800x600).jpg Finished installing rebar footing at Elev. 7-Stair -4,5 Facing South-West (800x600).jpg Installing rebar Footings at Elev. 7-Stair -4,5 Facing East (800x600).jpg Backfill foundation walls A-B line 4 Facing West (800x600).jpg Backfill Job site Facing South (800x600).jpg Finish rebar installation at footings Elev. 7-Stair -4,5 Facing North (800x600).jpg Securing the Shear wall panels at Elev. 1,2,3 2nd floor Facing East (800x600).jpg Waterproofing around foundation walls at Elev. 4-Stair -2 Facing North-East (800x600).jpg
Previous pageNext page Backfill foundation walls A-B line 4 Facing West (800x600)
Backfill foundation walls A-B line 4 Facing West (800x600)